User Tools

Site Tools


sdb:p85

Deposition date: 20060508

Target: Pr0.5Ca0.5MnO3compound target
Substrate: STO
Pressure: 3 mbar O2
Flow: 40 ml/min
Current:
Voltage:
Time:
Temp: 840 C
Remarks: Substrate was dropped inside the chamber during heating at 350C due to the problem in silver paste -
XRR:
Results
RBS:
Run:
File:
Result:

sdb/p85.txt · Last modified: 2006/05/15 13:29 by shahbaz

Donate Powered by PHP Valid HTML5 Valid CSS Driven by DokuWiki