====== Description ====== * very easy & fast to use, for, e.g., SEM sample metallization * background pressure: <1E-6mbar, 650V, <150mA, 54mm targets * no substrate cooling ====== Manual ====== ===== Start up & Loading sample ===== * Open N2 line at the wall 1/2 turn (check pressure reducer) * Open Ar bottle and the in-line valve in the yellow cabinet * Check if the required target material is in * If system is vented, insert your sample and close the top * Switch on system mains (green switch) * Switch on chiller (below the table) ===== Sputtering ===== * Purge the argon line by opening the needle valve and repeatedly opening and closing the argon valve at the bottle * Carefully close the needle valve to pump down * Switch turbo on at 1e-1 mbar by pressing "pumping unit" and "stand by" on the turbo controller * Adjust pressure using needle valve to 5E-2mbar * Set current dial knob to 0 and switch to "HTS" * Select sputtering time and press start * Adjust current dial for desired current (lower-righ indicator!) * Wait * Switch turbo pump off * If turbo stands still, switch off machine (green button), automatic N2 purging starts * Close Ar, N2 supply ; switch off chiller ===== change target ===== * open sputter head, fix head, * remove the two rings (with gloves, no force!) * replace target (manual: 54mm diameter) * note target material on machine! ====== recent rates & other info ====== ^ Material ^ Date ^ purpose ^ Process parameters ^ Measurement ^ Result ^ Rate ^ | Ag (?) | 20110623 | SEM of SU-8 | 5E-2 mbar, 15 mA, 15s | SEM pic | nice | | ====== bugs ====== ===== yellow HV light does not go on ===== Don't do this because of high voltage in the machine! {{:balzer-med010-relay.jpg?700|}}